Installation

Home
Bubbling Boulders
Basins
Mini Bubbling Boulders
Engravings
Custom Work
Commercial
Distributors and Dealers
Colors
About Mica
Gallery
Installation
Maintenance
Contact Us

Currently we are doing installations for the areas of Southern Wisconsin, Illinois, and Arizona.The installation process is a series of steps that will take an average of 5-6 hours to complete, depending on the area that is selected for placement.

1.  Choose your location.

 
 
 
 
 
 

 

img_5815small2.jpg

2.  Large Bubbling Boulder is unloaded from truck.

img_5815_1small.jpg

3. The selection of materials are unloaded and ready for the hole to be dug.

_MG_0156small.jpg

4.  Once the hole is dug, it is ready for the water basin.  Ground is dug about 6 inches down and must be level.

systemcomponents.jpg

5.  All materials are put in place.  Electrical outlet is necessary for pump to run.  An interior or exterior switch can be also be added by an Electrician.  Now you can sit back and enjoy your new beautiful Bubbling Boulder.

All Rights Reserved 2008 Van Laeke Photography